Stop 'ManageEngine Endpoint Central -Distribution Server' service from services.msc. While prompted for the location, specify the new location where you wanted to move the Distribution server. Now, install the distribution server on the same computer.After ensuring that the download is completed, Uninstall the existing distribution server from the Control panel > Add/ Remove Programs.Download the Agent for relevant Remote Office with respective Distribution Server. Select the remote office msi zip from the Endpoint Central server, by selecting the Remote Offices tab, under Scope of Management.Move Distribution Server from one to drive to another in the same computer Move Distribution Server from one computer to another.Move Distribution Server from one to drive to another in the same computer.To move a distribution server from one location to another, follow the steps given below: However, you can move the distribution server from one location to another and give it a new name. Renaming a remote office (with a distribution server): It is not possible to rename a distribution server.Moving the distribution server to another location because of low disk space in the current drive.Installing the server in a computer with a higher configuration.Moving the server from a test environment to a production environment.You may want to move a distribution server from one location to another in the following scenarios: This document provides steps required to move a distribution server from one computer to another. How to move a distribution server from one location to another? Description
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |